Steel Buildings

STAVROS NIARCHOS FOUNDATION CULTURAL CENTER

Year: 2013-2016 Buffer Zone (creation of a path from the library to the hill) Opera (main stage, amphitheater, box, fly tower, equipment rooms, auxiliary rooms, etc.) Library (metal balcony / path inside and outside, installation of metal staircases on each floor, etc.) Canopy base Lighthouse Bridge Exterior balconies of the opera Lighthouse Assembly, installation and [...]
Read More

NATIONAL THEATER OF GREECE

Year: 2007-2008 Construction of a central stage steel structure Reconstruction of the roof of an old building Installation of the covering
Read More

CONFERENCE CENTER “IOANNIS VELLIDIS” -THESSALONIKI

Construction and installation of air conditioning (air ducts and air conditioning units) Construction of iron construction Construction and installation of all small iron structures (railings - doors - security doors)
Read More

BLUM HELLAS-PAIANIA

Year: 2016 Assembly and installation of the main building with a total area of 1,700 sq.m. Installation of siding with polyurethane panels Installation of staircase Assembly and installation of industrial lofts and balconies Installation of outdoor canopies
Read More

STEEL BUILDING – TRIKALA IMATHIA

Year: 2006 Construction of a building 62 meters long and 26 meters wide Erection and installation of a metal frame Installation of a side roof of a building Installation of a building roof
Read More

RECEPTION CENTER ALEXANDREIO MELATHRON – ALEXANDRIA IMATHIA

Year: 2008 Construction and installation of a reception center
Read More

GREEK CAMP “RIGAS FERRAIOS” -KOSOVO

Year: 2000 Construction and installation of administration buildings-restaurants-kpsmmaintenance teams Construction of elevated outposts Construction of central gate and fencing
Read More

PRAKTIKER BUILDING-ELEFSINA

Year: 2007 Dismantling of the former VIEX factory Installation of various iron constructions Building housing (panels and glazing) Building air conditioning and ventilation (air ducts-air conditioning units)
Read More

OLYMPIC VILLAGE – ATTICA

Construction and installation of all small iron structures of two hundred (200) houses (railings-doors-security doors)
Read More

PRESS CENTER JOURNALIST M.P.C.-ATTICA

Construction of eleven (11) floors of 27,000 sq.m. and weight 8,000 tons Installation of external frames and bark of the building Construction of chimneys of boiler rooms Air conditioning and ventilation of the building (air ducts - air conditioning units)
Read More