Projects

STAVROS NIARCHOS FOUNDATION CULTURAL CENTER

Year: 2013-2016 Buffer Zone (creation of a path from the library to the hill) Opera (main stage, amphitheater, box, fly tower, equipment rooms, auxiliary rooms, etc.) Library (metal balcony / path inside and outside, installation of metal staircases on each floor, etc.) Canopy base Lighthouse Bridge Exterior balconies of the opera Lighthouse Assembly, installation and [...]
Read More

PUBLIC ELECTRICITY COMPANY SA – 5 UNITS – PTOLEMAIDA

Year: 2017-Today Construction of steel structures PipeRack Construction of metal construction FGDs 1,500 tons Construction of steel construction 1,100 tons (lignite transfer house) Construction of a roof of 3,500 sq.m. and 380 tons (Turbine House) Installation of stairways, lofts with a total weight of more than 500 tons
Read More

DISMANTLING OF A FUEL TANK AND REPLACING IT BACK IN PLACE – VASILIKO CYPRUS

Έτος: 2020 The metallic fuel tank of 16 meters diameter, 22 meters height and 150 tons weight was dismantled. Then the pedestal (base) of 260 tons weight was moved and the tank was placed back again. Total weight 410 tons. Youtube: https://www.youtube.com/watch?v=Z85fYWa8aBU https://www.youtube.com/watch?v=9FWgmx074Zo
Read More